Sign in
7YRSShenzhen Xinhongfa Environmental Protection Equipment Co., Ltd.

ŞİRKETE GENEL BAKIŞ

Şirket Albümü

Temel Bilgiler

ÜRÜN KAPASİTESİ

Üretim Akışı

The entire production process
1. Cut the material according to the machine size 2. Main body of plastic welding equipment 3. Machining fine parts of machine through drilling and milling 4. Electricians design and assemble electric control system 5. Test the performance of machine

Üretim Ekipmanı

Ad
Hayır
Miktar
Doğrulandı
Large bench drilling machine
ZQ4116
1
Large turret milling machine
CS62508
1
1 large turntable
xhf200901
1
Large lathe
xhf200902
1
Large desktop cutting machine
xhf200903
1
Bench grinder
xhf200904
1
Rolling machine
xhf200905
1
Large air compressor
xhf200906
1
Sawing machine
xhf200906
2
Plastic welding machine
QL
15
Flashlight saw
xhf200909
10
Hand planer
xhf20090110
5
Small bench drilling machine
ZQ4116
2
Argon arc welding machine
xhf200907
1
Electric welding machine
xhf200908
1
Doğrulandı

Fabrika Bilgileri

Fabrikanın Büyüklüğü
Below 1,000 square meters
Fabrikanın Bulunduğu Ülke/Bölge
102, Building 10, Gaosite Industrial Area, Liuhe Community, Pingshan Street, Pingshan New District, Shenzhen, China. 518118.
Üretim Hatlarının Sayısı
5
Sözleşmeli Üretim
Design Service Offered
Yıllık Çıktı Değeri
US$2.5 Million - US$5 Million

Yıllık Üretim Kapasitesi

Ürün Adı
Üretilen birimler
En yüksek
birim Türü
Doğrulandı
Machine for polishing jewelry with heated acid
200
300
Set/Sets
Acid gas treatment machine
200
300
Set/Sets
The electroforming machine for 3D hard gold jewelry
300
500
Set/Sets
The electroforming machine for 3D hard silver jewelry
300
500
Set/Sets
The precious metal (gold/silver) recovery machine
5000
5000
Set/Sets
Doğrulandı

Üretim Hattı

Üretim Hattı
Danışman
Operatör Sayısı
Sıralı QC/QA sayısı
Doğrulandı
Preparation material production line
1
3
1
Turning, drilling and milling finishing production line
1
2
1
Welding production line
1
5
2
Doğrulandı

KALİTE KONTROL

Kalite Yönetimi Süreci

Test machine running
add water to machine and connect it to electricity. Run the machine for 2-3 days, check if the machine is leaking and whether the works are normal.